Sunday, February 21, 2010



Here is the new pump, pretty much done and ready to mount on the bike. The lower fitting goes to the radiator and the upper feeds the engine. The studs holding it together are extra long because they will also go through the mounting bracket. As you can see, I also cast and machined the pulley. It was a regular deal, no need to elaborate. I got all set up to cut out the bracket and realized I was out of acetylene. After a trip to the welding supply I will get with it. I hope to have it all done and pumping by the end of this week.

No comments: