Saturday, May 21, 2011

Prototyping and Change Orders

I stayed pretty busy today. I generally go into the shop with high hopes of getting something done, but often end up being distracted. I suspect it's an ADD thing or sumpthin'. I rarely seem to work in a linear fashion, choosing instead to fiddle fart around with three or four minor projects instead. I made a mounting bracket for the fuel pressure regulator. I re assembled the paint free frame around the engine/trans unit. The transmission crossmember that I built previously will need some minor notching to clear the large front pulley. It actually clears as is, but I need a bit more so I can change the belt without splitting the frame. The old swing arm is another story entirely. It has been cut and welded too many times and the pivot mounts need to be altered to clear the pulley as well. So, it to, has been consigned to The Big Box O' Failures. I feel that Boy Geniuses™ rarely fail, so henceforth The BBOF shall be known as The Big Box O' Prototypes. Has a much more professional ring to it. I grabbed two more pieces of the 2 inch square tube that the first swing arm was made from, mounted them in the mill and cut the slots for the axle just as I did in January 2008. No need for pictures, same deal as before. Tomorrow I hope to make up the new pivot mounts. cut and weld the swing arm to put the bend in it and weld on the shock mounts. The new swing arm crossmember will be much simpler, hopefully, than the old cut, weld, cut weld, #*&%#*& lousy no good, cut weld again monstrosity. We'll see.

0 comments: